Highlights

Final stage of work: Wood chip drying unit for panel manufacturing

in this final stage, we present the headbox that was manufactured by Vicometal, where the material (madeira) wet enters the ...
Ler Mais

4st phase of work: Wood chip drying unit for panel manufacturing

At this stage of the work, welds were carried out in order to unite the various parts that make up the drum with ...
Ler Mais

22nd and 3rd phase of the work: Wood chip drying unit for panel manufacturing

21st Phase of the work The continuation of the work concerns the assembly of Cyclones for suspension of sand from the ...
Ler Mais

Initial phase of work: Wood chip drying unit for panel manufacturing

See the photographs of the initial phase of this great work in Cella, Spain. We present the preparation of the assembly of the metallic structure ...
Ler Mais

Test carried out to test and ensure compliance with Quality requirements in Silo

Moments before the radiographic test with gamma rays (gamagrafia) to be carried out on the end-to-end joints of the Silo. was also carried out ...
Ler Mais

Final welds in Silo

Final welding phase of a Silo for storage in an industrial context. In this phase we witness a corner weld ...
Ler Mais

Mounting and alignment of bearings and roller bearings

Today was the day for us to take a peek at the meticulous work we have at hand in the workshop, which will soon travel to ...
Ler Mais

Great work started at Vicometal towards Nelas

All our works have a history, this one in Nelas started in our preparation department, after the manufacture, has pre ...
Ler Mais

Silo – Completion of final welds and Assembly

Watch the assembly of a Gray Silo fully manufactured and executed by Vicometal. Manufacturing started at the facilities of ...
Ler Mais

Chimney Ø1600

Vicometal manufactured a chimney with Ø1600 in carbon steel and execution class EXC3, second to EN1090-2. Check out the photos ...
Ler Mais
Loading...